Complete CMMS solution for FMCG manufacturing operations

Maximize production line OEE, minimize changeover downtime, and maintain audit-ready maintenance records with intelligent maintenance management designed for high-speed consumer goods manufacturing.

FMCG Manufacturing CMMS

High-speed production line maintenance platform

OEE Tracking

Real-time line performance

Changeover PM

SKU transition scheduling

Audit-Ready Records

Compliance documentation

Quality Analytics

First-pass yield tracking

Our Features

Built for Fast-Moving Consumer Goods Manufacturing

Complete maintenance management tools for bottling lines, filling machines, packaging equipment, mixers, homogenizers, and processing systems operating in high-speed, multi-SKU production environments

Digital Equipment Inspections

Customizable checklists for fillers, cappers, labelers, conveyors, mixers, and CIP systems with GMP-compliant documentation and electronic signatures.

Production-Based Maintenance

Schedule maintenance based on units produced, bottles filled, or machine cycles—not arbitrary calendar intervals that disrupt production schedules.

Changeover Management

Coordinate maintenance with SKU changeovers to minimize line downtime. Track changeover times and optimize transition procedures for multi-product lines.

Regulatory Documentation Support

Maintain audit-ready maintenance records with digital signatures, timestamps, and complete audit trails to support FDA inspections, HACCP protocols, and food safety requirements.

OEE & Production Analytics

Monitor Overall Equipment Effectiveness with availability, performance, and quality metrics. Track downtime causes, first-pass yield, and line efficiency in real-time.

Mobile Platform for Production Floors

Empower maintenance teams with mobile access designed for fast-paced production environments with QR scanning, photo capture, and real-time notifications.

MOBILE SOLUTION

Mobile Inspection App for FMCG Production Teams

Equip your operators and maintenance crews with a mobile inspection app built for high-speed consumer goods manufacturing environments:

  • Complete digital inspection checklists near production lines, filling stations, and packaging areas
  • Access equipment history, sanitation logs, and calibration records instantly
  • Report equipment issues with photos, timestamps, and production impact assessment
  • Capture electronic signatures for GMP compliance and audit trail documentation
  • QR/barcode scanning for rapid asset identification and spare parts lookup

Mobile Inspection App

For FMCG Maintenance Teams

Real-Time Sync

Instant updates to production teams

Equipment History

Sanitation & calibration records

GMP Documentation

Electronic signatures & audit trails

Asset Scanning

QR/barcode for rapid identification

Analytics Dashboard

Real-Time Production Line Insights

Make data-driven decisions with comprehensive FMCG manufacturing performance analytics:

  • Live OEE dashboards showing availability, performance, and quality metrics by line
  • Downtime analysis with Pareto charts identifying top equipment failure causes
  • Changeover time tracking with SMED optimization insights for faster SKU transitions
  • First-pass yield monitoring to reduce waste, rework, and quality defects
  • Automated alerts for equipment anomalies before they impact production
See Dashboard Demo

Real-Time Analytics Dashboard

Production Line & Equipment Insights

OEE Monitoring

Availability × Performance × Quality

Downtime Pareto Analysis

Root cause identification

Changeover Tracking

SMED optimization insights

Quality Metrics

First-pass yield & defect tracking

Equipment Coverage

Complete Asset Hierarchy for FMCG Operations

Deep asset management supporting plant-to-component tracking across all FMCG manufacturing categories—food & beverage, personal care, household products, and cosmetics:

  • Bottling lines with fillers, cappers, labelers, conveyors, and accumulation tables
  • Packaging equipment including cartoners, case packers, shrink wrappers, and palletizers
  • Processing systems: mixers, homogenizers, blenders, reactors, and heat exchangers
  • CIP (Clean-in-Place) systems, pasteurizers, and sanitation equipment
  • Quality control equipment: checkweighers, metal detectors, and vision inspection systems
View Equipment Checklists

FMCG Equipment Coverage

Complete Asset Management

Filling & Bottling

Fillers, cappers, labelers, rinsers

Packaging Systems

Cartoners, case packers, palletizers

Processing Equipment

Mixers, homogenizers, blenders, reactors

Sanitation & Quality

CIP systems, checkweighers, detectors

Safety & Compliance

Audit-Ready Maintenance Documentation

Pre-configured inspection templates help maintain documentation for food safety audits and regulatory inspections:

  • Complete maintenance audit trails with digital signatures and timestamps
  • Equipment sanitation and cleaning verification logs
  • Calibration records and preventive maintenance documentation
  • Historical maintenance records instantly accessible for auditor requests
  • Customizable inspection checklists for food safety and quality procedures
View Safety Checklists

Safety & Compliance

Audit-Ready Documentation

Digital Audit Trails

Timestamped maintenance records

Electronic Signatures

Verified completion records

Sanitation Logs

Cleaning verification tracking

Calibration Records

Equipment calibration history

Why Choose Oxmaint

Benefits for FMCG Plant Managers

Maximize Production OEE

World-class OEE is 85% for discrete manufacturing. Oxmaint helps identify availability, performance, and quality losses to move from typical 40-60% OEE toward world-class benchmarks.

Reduce Changeover Time

Coordinate maintenance with SKU transitions using SMED principles. Reduce changeover-related downtime and maximize production time for multi-product FMCG lines.

Audit-Ready Documentation

Maintain complete maintenance records with digital signatures, timestamps, and audit trails. Historical documentation instantly accessible for FDA inspections and food safety audits.

Real Results from FMCG Manufacturers Using Oxmaint

15% OEE Improvement in 6 Months

A personal care products manufacturer with 4 bottling lines improved overall OEE from 62% to 77% within 6 months of implementing Oxmaint's production-based maintenance scheduling and real-time downtime tracking.

77% Line OEE

Up from 62% with Oxmaint implementation

35% Faster Changeovers

SKU transition time reduced with SMED tracking

Passed Food Safety Audit

Complete documentation ready for inspectors

Trusted by Consumer Goods Manufacturers

"Oxmaint's production-based scheduling transformed our maintenance approach. Instead of arbitrary calendar intervals, we now trigger PM based on bottles filled. Our filler nozzle replacements happen at the optimal time—reducing both premature changes and unexpected failures."

Maintenance Manager

Beverage Manufacturer - 4 high-speed bottling lines

"The auditor was impressed with our documentation. Every sanitation record, calibration log, and maintenance activity was instantly accessible. Oxmaint helped us prepare for our food safety certification audit."

Quality Assurance Director

Food Processing Facility - Multi-category FMCG production

Latest Posts

high-volume-production-efficiency-fmcg
Read More

How FMCG Firms Manage High-Volume Production Without Losing Efficiency

Your packaging line processes 450 units per minute when running perfectly. Three weeks later, throughput has degraded to 398 units per minute. That's 52 units lost every 60 seconds. Over an 8-hour shift, your...

best-practices-fmcg-quality-control
Read More

Quality Control Best Practices in FMCG Manufacturing: A Complete Guide

Your GFSI auditor found the gap: "Documentation incomplete." Not because your quality controls failed—because you couldn't prove they worked. Missing calibration dates. Lost sanitation logs. Temperature...

preventive-maintenance-fmcg-plants
Read More

Why Preventive Maintenance Is Critical for FMCG Plants

A mixer bearing scheduled for preventive replacement costs $2,800 during planned downtime. Ignoring it until failure during production: $21,700 in emergency repairs, lost output, and penalties. That $18,900...

reduce-operational-costs-fmcg-companies
Read More

How FMCG Companies Can Reduce Operational Costs

Your facility just discovered $180,000 in annual waste hiding in plain sight. Not from renegotiating supplier contracts or cutting headcount—from something simpler: Oxmaint's CMMS identified compressed air...

sustainability-trends-fmcg-industry
Read More

Sustainability Trends in the FMCG Industry

Your facility just reduced annual energy consumption by 18% without installing a single solar panel. The savings came from something simpler: Oxmaint's CMMS platform identified equipment running inefficiently,...

data-analytics-fmcg-supply-chain-visibility
Read More

How Data Analytics Improves FMCG Supply Chain Visibility

Your analytics dashboard shows 94% inventory accuracy, 2.3-day average fulfillment speed, and 87% on-time delivery. The data looks excellent. Then your packaging line's bearing fails unexpectedly, halting...

impact-of-automation-fmcg-manufacturing
Read More

Impact of Automation on FMCG Manufacturing

Your production line just completed 847,000 units today—without a single quality defect reaching packaging. Not because you hired more inspectors, but because automated vision systems caught every misaligned...

inventory-optimization-fmcg-businesses
Read More

Inventory Optimization Strategies for FMCG Businesses

Your warehouse holds $2.4 million in FMCG inventory right now. But here's the uncomfortable truth: $912,000 of that—38% of your total stock—is excess inventory that shouldn't be there. Those cases of...

fmcg-brands-using-ai-improve-operations
Read More

How FMCG Brands Are Using AI to Improve Operations

Your production line just prevented a $50,000 recall. Not because a quality inspector caught a defect—because Oxmaint's AI-powered vision integration detected a 0.3mm packaging seal irregularity at 300 units...

predictive-analytics-fmcg-demand-forecasting
Read More

Role of Predictive Analytics in FMCG Demand Forecasting

Last quarter's forecast predicted 12,000 units. You produced 12,000 units. Actual demand: 16,500 units. The 4,500-unit stockout cost $81,000 in lost sales and emergency expedited production added $24,000. This...

supply-chain-challenges-fmcg-companies
Read More

Top Supply Chain Challenges Facing FMCG Companies Today

A demand forecast predicted 2,500 units. Actual demand: 4,100 units. The stockout cost $18,000 in lost sales and $7,200 in emergency production. Meanwhile, another SKU sits with 40% excess inventory from...

digital-transformation-reshaping-fmcg-industry
Read More

How Digital Transformation Is Reshaping the FMCG Industry

The FMCG production line that ran efficiently in 2020 won't survive 2025. Traditional manufacturing approaches—paper-based logs, reactive maintenance, disconnected systems—now represent competitive...

oee-challenges-high-speed-fmcg-lines
Read More

OEE Challenges in High-Speed FMCG Lines: Causes, Impact & Solutions

Your high-speed packaging line runs at 600 units per minute when it runs. But it only runs 67% of scheduled time. When it does run, it operates at 82% of design speed due to micro-stops you can't quite identify....

digital-inspections-fda-haccp-compliance
Read More

Digital Inspections for FDA & HACCP Compliance: Faster, Smarter Audits

The FDA inspector arrives unannounced at 9:47 AM. Your quality manager spends the next 90 minutes locating temperature logs from three different filing cabinets, assembling sanitation records from six...

operator-errors-high-speed-fmcg-lines
Read More

Operator Errors in High-Speed FMCG Lines: Causes, Risks & Prevention

The packaging line runs at 600 units per minute. An operator adjusts the wrong parameter during a changeover. Within 47 seconds, 470 defective packages exit the line before anyone notices. The cost? $8,200 in...

roi-digital-quality-systems-food-plants
Read More

ROI of Digital Quality Systems in Food Plants: Cost Savings & Compliance Gains

Your quality manager just spent three hours manually compiling data for an FDA audit. The finished product lot that shipped yesterday? It contained a batch with incomplete temperature logs because someone forgot...

food-safety-data-traceability-architecture
Read More

Food Safety Data Traceability Architecture: Ensuring Compliance & Transparency

The FDA inspector asks for your traceability records. You have 24 hours to provide them in electronic spreadsheet format. Can you do it? If your answer isn't an immediate "yes," you're not alone—and you're...

fmcg-production-benchmarks-oee-waste
Read More

FMCG Production Benchmarks: OEE & Waste Reduction Metrics

Your production line just lost 47 minutes to an unplanned changeover. Again. The OEE report shows 68% efficiency, but you're not sure if that's competitive or concerning. Meanwhile, your scrap rate hovers around...

cost-of-product-recalls-fmcg-manufacturing
Read More

Cost of Product Recalls in FMCG Manufacturing: Risks & Financial Impact

The recall notice went out at 3:47 PM on a Tuesday. By Wednesday morning, your product was national news. By Friday, the FDA penalty letter arrived. By month's end, your largest retail partner had pulled your...

preventive-vs-predictive-maintenance-fmcg
Read More

Preventive vs Predictive Maintenance in FMCG: Key Differences & Benefits

Your maintenance team performed 42 scheduled preventive maintenance tasks last month. Cost: $127,000. Hours invested: 336. Equipment still experienced 3 unexpected failures during production runs, costing an...

downtime-impact-on-fmcg-margins
Read More

Why Downtime Severely Impacts FMCG Margins

A 47-minute production stoppage can drain $28,200 in lost output—that’s $600 every minute. In FMCG manufacturing, where net margins often hover around 6%, a single unplanned breakdown can wipe out the profit...

Total Posts:

INDUSTRIAL INTEGRATIONS

Connect Your Production Systems

Oxmaint integrates with ERP systems, IoT sensors, and accounting platforms to create a unified FMCG manufacturing ecosystem.

Explore all integrations

FAQ

Frequently Asked Questions

Oxmaint supports the complete FMCG manufacturing process including bottling lines (fillers, cappers, labelers, rinsers, conveyors), packaging equipment (cartoners, case packers, shrink wrappers, palletizers), processing systems (mixers, homogenizers, blenders, emulsifiers, reactors, heat exchangers), sanitation equipment (CIP systems, pasteurizers), and quality control equipment (checkweighers, metal detectors, vision inspection systems). Our asset hierarchy supports tracking from plant level down to individual components across food & beverage, personal care, household products, and cosmetics manufacturing.

Unlike calendar-based maintenance, Oxmaint triggers maintenance tasks based on actual production metrics. For fillers, this means scheduling nozzle replacements based on bottles filled. For conveyors, maintenance triggers based on units transported. For mixers and homogenizers, PM schedules based on batch cycles completed. This approach avoids both premature maintenance (wasting resources) and unexpected failures (causing production losses and potential quality issues).

Oxmaint provides comprehensive maintenance documentation to support food safety audits. Features include electronic signatures for maintenance activities, complete audit trails with timestamps, equipment sanitation and cleaning logs, calibration records, and corrective action documentation. All records are instantly accessible for auditor requests, reducing audit preparation time significantly. Oxmaint helps you maintain the maintenance documentation portion of your food safety program—the actual compliance requirements depend on your specific facility and regulatory obligations.

Oxmaint tracks the three components of OEE (Overall Equipment Effectiveness): Availability (planned vs. actual production time, including unplanned stops and changeovers), Performance (actual vs. ideal cycle time), and Quality (good units vs. total units, including rework). Real-time dashboards show OEE by line, shift, and time period. Downtime Pareto analysis identifies top causes of availability losses, helping maintenance teams prioritize improvements to move toward the world-class benchmark of 85% OEE.

Yes, Oxmaint provides API-based integration with ERP systems (SAP, Sage, QuickBooks), MES (Manufacturing Execution Systems), IoT sensor platforms (Samsara), and production monitoring systems. This enables real-time data flow from production counters to trigger maintenance tasks, automatic synchronization of work orders with accounting for cost tracking, and unified reporting across production and maintenance operations.

Transform Your FMCG Manufacturing Operations

Join leading consumer goods manufacturers who trust Oxmaint to maximize production line OEE, reduce changeover downtime, and ensure regulatory compliance in high-speed, multi-SKU manufacturing environments.