Build a complete digital registry of all your enterprise assets. Track equipment details, manage hierarchies, monitor IoT sensors, and optimize asset lifecycle—all from one centralized CMMS platform.
Everything you need for enterprise asset management. From registration to retirement, each step ensures complete asset visibility.
Create a complete digital registry of all your enterprise assets. Capture essential information including identity, location, category, and operational status in a centralized database.
Unique asset names, IDs, and identification numbers for easy tracking.
Organize assets by type: Equipment, Vehicles, Facilities, Tools.
Define hierarchy levels: Site, Building, Floor, Room, Equipment.
Monitor Active, Inactive, and Production status in real-time.
Assign assets to specific locations within your organization.
Add detailed descriptions and notes for each asset.
Capture complete technical specifications for every piece of equipment. Track manufacturer details, model information, serial numbers, and criticality ratings to ensure proper maintenance planning.
Record manufacturer name, contact info, and warranty details.
Store model numbers, versions, and equipment variants.
Track unique serial numbers for warranty and identification.
Record manufacturing date for lifecycle and age tracking.
Assign criticality levels for maintenance prioritization.
Document detailed technical specs and operating parameters.
Track critical dates throughout the asset lifecycle. From installation to commissioning, maintenance schedules to warranty expiration—never miss an important milestone.
Record when the asset was first installed and operational.
Track when the asset was formally commissioned.
Monitor when the last maintenance was performed.
Schedule and track upcoming maintenance activities.
Get alerts before warranty periods expire.
Plan for asset retirement and replacement.
Track acquisition costs, current values, and total cost of ownership. Make data-driven decisions about repairs, replacements, and capital investments.
Record original purchase price and procurement costs.
Track depreciated value and current book value.
Track cumulative maintenance and repair expenses.
Support for GBP, USD, EUR, and other currencies.
Calculate and track asset depreciation over time.
Analyze return on investment for each asset.
Monitor asset performance with production metrics, cycle times, and capacity tracking. Calculate OEE (Overall Equipment Effectiveness) and identify improvement opportunities.
Track scheduled operating hours for each asset.
Define optimal cycle times for performance benchmarks.
Record maximum design capacity and output limits.
Flexible units: units/hour, kg/day, liters/minute.
Monitor availability and downtime for each asset.
Automatic OEE calculation from availability, performance, quality.
Connect your assets to IoT sensors for real-time monitoring. Integrate with ERP systems via SAP equipment numbers, and track assets with QR codes and barcodes.
Connect to sensors for real-time condition monitoring.
Link assets to SAP equipment records for ERP sync.
Map to SAP asset master for financial integration.
Generate and assign QR codes for quick identification.
Use existing barcodes for asset identification.
Store detailed technical specs and documentation.
Generate unique QR codes for each asset to enable instant identification and quick maintenance request submission. Simply scan to access asset details or report issues.
Each asset gets a unique QR code for identification.
Scanning pre-fills maintenance request with asset details.
Print QR codes and attach directly to equipment.
Workers scan codes to quickly report equipment issues.
Durable labels for outdoor and harsh environments.
Scan with OxMaint mobile app on iOS and Android.
Organize assets by category: Equipment, Vehicles, Facilities.
View assets in parent-child hierarchy structure.
See assets grouped by physical location.
Flexible list or grid display with detailed info.
View and organize your assets in multiple ways. Switch between category, hierarchy, location, list, and grid views to find assets quickly.
Filter by status, category, level, location, and custom fields.
Search assets by name, number, description, or any field.
Drill down into categories and hierarchies with expand/collapse.
OxMaint's asset management integrates seamlessly with all maintenance modules for complete operational visibility.
We bring solutions to make asset management easier for our customers.
Reduced Downtime
Asset Visibility
Customer Satisfaction
"OxMaint's asset management has given us complete visibility over our entire equipment fleet. We know exactly where every asset is and its current condition."
Oceanix Maritime
Maritime
"The QR code feature is a game-changer. Our technicians can scan equipment and instantly access maintenance history and report issues."
Industrial Solutions Co.
Manufacturing
"IoT sensor integration has transformed our maintenance from reactive to predictive. We now catch issues before they cause downtime."
PowerGrid Utilities
Utilities
"Financial tracking by asset gives us clear insights into total cost of ownership. We can now make data-driven replacement decisions."
TransGlobal Fleet
Transportation
Everything you need to know about OxMaint's asset management capabilities.
Asset management software is a digital solution that helps organizations track, manage, and maintain their physical assets throughout their lifecycle. OxMaint's asset management module allows you to create a centralized registry of equipment, track specifications, monitor costs, integrate IoT sensors, and generate QR codes for quick identification.
Yes, OxMaint supports multi-level asset hierarchies. You can define parent-child relationships between assets, such as a building containing floors, floors containing rooms, and rooms containing equipment. This hierarchy view helps you understand asset relationships and roll up costs and maintenance data to parent levels.
Yes, OxMaint supports IoT sensor integration for real-time condition monitoring. You can connect sensors that monitor temperature, vibration, pressure, and other parameters. This enables predictive maintenance by alerting you to potential issues before they cause equipment failures.
OxMaint generates unique QR codes for each asset. You can print these codes and attach them to your equipment. When workers scan the QR code using the OxMaint mobile app, they can instantly view asset details, maintenance history, and submit work requests with the asset information pre-filled.
Yes, OxMaint provides comprehensive financial tracking for assets. You can record acquisition costs, current values, maintenance expenses, and calculate total cost of ownership. The system supports multiple currencies and helps you track depreciation over time for better capital planning decisions.
Build a complete digital registry of all your assets. Track equipment, manage hierarchies, monitor IoT sensors, and optimize lifecycle management.
OxMaint is available to download from both App Store and Google Play Store.
