SAP Materials Management (MM) module Integration with Oxmaint

By linking SAP MM’s robust material and procurement capabilities with Oxmaint’s comprehensive maintenance management features, organizations can achieve optimal inventory accuracy, reduce downtime, and streamline their maintenance workflows.

automation

Your Feedback Fuels Our Growth: Share Your Experience!

button-appstore button-google-play

The benefits we offer is specifically designed to meet your needs

Improved Data Accuracy and Consistency

Ensures that data related to inventory, work orders, maintenance schedules, and assets is consistently updated across systems, reducing errors.

Enhanced Operational Efficiency

Aligns material requirements, procurement processes, and maintenance activities, leading to better resource utilization and reduced downtime.

Comprehensive Asset Management

Provides comprehensive tracking of asset performance, maintenance history, and costs, leading to better asset utilization and management.

Optimized Maintenance Processes

Enables effective scheduling and execution of preventive maintenance activities, helping to avoid unplanned downtimes and extend asset life.

SAP MM Module Operations

Goods Issue (GI)

The Goods Issue (GI) process in the SAP MM module involves the removal of goods from inventory, typically for production or sales. The GI API automates this process, ensuring inventory levels are accurately updated.

Goods Transfer(GT)

Goods Transfer (GT) in the SAP MM module manages the movement of materials between different storage locations or plants within an organization. The GT API streamlines this process by automating the transfer and updating inventory records.

Goods Receipt (GR)

The Goods Receipt (GR) process records the receipt of goods into inventory, typically following a purchase order. The GR API ensures that inventory levels are accurately reflected and updated upon receiving goods.

Material Reservation

Material Reservations in the SAP MM module involve setting aside inventory for specific future use, such as production or maintenance. The Material Reservations API facilitates this by automating the reservation process.

Why Choose Oxmaint?

INTEGRATING SAP MM WITH SAP PIPO REST API.

increase-productivity

API Endpoint for Goods Issue(GI)

The Goods Issue (GI) endpoint is used to record the issuance of materials from a warehouse or storage location. This operation typically reflects the physical removal of stock from inventory, impacting the stock levels and inventory value.

streamline-processes

API Endpoints for Goods Transfer(GT)

The Goods Transfer (GT) endpoint is used to facilitate the movement of materials between different locations within the organization, such as between plants or storage locations.

improves-team-communication

API Endpoints for Goods Receipt(GR)

The Goods Receipt (GR) endpoint is used to record the receipt of goods into inventory, typically as a result of a purchase order. This operation increases the stock levels and inventory value.

reduce-asset-downtime

API Endpoint for Material Reservation

The Material Reservations endpoint is used to create and manage reservations for materials, ensuring that stock is set aside for specific purposes or future use.

Features and Solutions

SAP Integration feature provide solutions that simplify and improve your operations.

Integrating SAP with Oxmaint enhances equipment reliability by ensuring timely and accurate maintenance. Real-time data synchronization allows for proactive identification and resolution of potential issues. This leads to fewer breakdowns and extends the life of critical assets.

The integration of SAP with Oxmaint minimizes equipment downtime through efficient work order management and preventive maintenance scheduling. Real-time updates and automated workflows ensure that maintenance tasks are performed promptly. This results in increased operational uptime and productivity.

Integrating SAP with Oxmaint helps mitigate risks and improve workplace safety by ensuring regular and thorough maintenance. Consistent monitoring and timely maintenance reduce the likelihood of equipment failures. This proactive approach enhances the overall safety of the operational environment.

The integration ensures compliance with industry regulations by maintaining accurate and up-to-date maintenance records. Automated documentation and reporting features facilitate adherence to regulatory standards. This helps organizations avoid penalties and ensures continuous regulatory compliance.

Join Our Community

Manage work orders, report asset issues, perform inspections and more.

Get In Touch

Got any questions? Don't hesitate to get in touch.

Address
440 N. Wolfe Road, Sunnyvale, CA 94085
Phone
+91 9460222122
+44 117 463 1010
+1 581 880 1010
+1 786 891 1010

Scan & Download Our Apps Now!

qr