Connect Atob fuel cards to automatically import every transaction in real-time. Track fuel expenses per vehicle, calculate MPG, detect fraud, and correlate costs with maintenance activities. Eliminate manual receipt entry and gain complete fuel visibility.
1200k+ Active users Automated fuel tracking
Fuel Spend (Month)
Avg MPG (Fleet)
Gallons (Month)
Anomaly Alerts
Recent Fuel Transactions
Today Truck #2451 - 45.2 gal, $158.20
Today Van #1204 - 18.5 gal, $64.75
Alert Truck #3567 - Low MPG detected
Manual Atob Receipt Entry
Atob Transaction Import
Fuel Expense Tracking
MPG Calculation Data
Atob provides advanced fuel card management with seamless API integration for Oxmaint
Accepted at 95% of U.S. fuel stations with competitive pricing and no transaction fees
Mobile app for drivers, instant card activation, and real-time spending controls
AI-powered anomaly detection, spending limits, and merchant category restrictions
Real-time transaction data flows directly to Oxmaint within minutes of purchase
Seamless fuel transaction data flow from Atob cards to maintenance tracking
Connect to Atob's API to automatically import every fuel purchase within minutes. Each transaction includes date, time, station location, vehicle ID, driver name, gallons, price per gallon, total cost, and odometer reading. Transactions link automatically to vehicles by card assignment. Historical data from the past 90 days imports during setup.
Automatically calculate MPG by comparing Atob purchases to GPS odometer data or manual entries. Cost per mile metrics combine fuel expenses with mileage for true operating costs. Fleet dashboards display average MPG, total spend, and efficiency comparisons. Anomaly detection flags unusual consumption patterns—sudden MPG drops indicate maintenance needs like dirty filters, tire issues, or engine problems.
Link Atob data to maintenance activities to identify cost patterns. Track fuel costs before and after repairs to validate effectiveness. Fraud detection compares purchase locations to GPS positions—alerts trigger when purchases occur far from vehicle locations. Monitor for suspicious activity like multiple fill-ups in short periods or after-hours transactions. Driver-specific cards provide accountability and identify training needs.
Current MPG -12%
Cost Per Mile
Active Alerts
Truck #2451: MPG dropped 15% - Check filters
Van #1204: Unusual purchase location
Stop collecting handwritten receipts and typing data into spreadsheets. Atob integration automatically imports every purchase with complete details. Save 8-12 hours weekly on manual entry. Eliminate data entry errors from illegible receipts or lost paperwork. Real-time import keeps fuel data current without administrative delay.
Declining fuel efficiency signals maintenance problems before breakdowns occur. MPG drops of 10-15% indicate dirty air filters, low tire pressure, failing oxygen sensors, or engine issues. Catch problems early through automated monitoring and proactive alerts.
Cross-reference Atob purchase locations with GPS vehicle positions to detect fraud instantly. Alerts trigger when purchases occur 50+ miles from vehicle location. Identify unauthorized after-hours purchases or weekend fill-ups. Monitor for excessive fill-up frequency indicating theft or siphoning.
Everything you need for comprehensive fuel tracking and cost management
Real-time import of every Atob purchase with complete details including date, time, station, driver, vehicle, gallons, price, and cost from Atob's API.
Automatic fuel efficiency calculation comparing Atob gallons to miles driven with historical trending and fleet-wide benchmarking.
Precise cost per mile metrics combining Atob expenses with vehicle mileage for accurate operating cost analysis.
Cross-reference Atob purchase locations with GPS vehicle positions to detect fraud and validate purchases occurred near actual locations.
Automatic alerts for unusual consumption, sudden MPG drops, excessive fill-ups, or purchases outside normal operating areas.
Individual driver Atob cards with transaction tracking showing who purchased fuel, when, and where for complete accountability.
Correlate Atob fuel efficiency with maintenance activities to validate repair effectiveness and identify if maintenance improved MPG.
Historical Atob cost analysis with monthly/quarterly/annual trends, budget variance tracking, and forecasting for financial planning.
Detailed reporting including Atob spend by vehicle, MPG by driver, cost per mile, efficiency trends, and exception reports.
Explore other powerful integrations to enhance your CMMS
Combine Atob data with GPS odometer for precise MPG calculation and location-based fraud detection.
Learn MoreSync Atob expenses to QuickBooks, Xero, or NetSuite for automated GL coding and allocation.
Learn MoreCorrelate Atob data with manufacturer diagnostics to identify engine issues impacting fuel efficiency.
Learn MoreEverything you need to know about Atob fuel card integration
Oxmaint connects to Atob's API to automatically import fuel transactions in real-time. Transaction data includes date, time, location, driver, vehicle, gallons, price, cost, and odometer reading. Transactions match to fleet vehicles automatically. Historical data from the past 90 days imports during setup. Integration takes 2-3 business days with API credentials.
MPG calculation compares fuel purchases to vehicle mileage. With GPS integration, Oxmaint uses GPS odometer readings for automatic calculation. Without GPS, drivers enter odometer at pump or manually. System calculates: (Current Odometer - Previous Odometer) ÷ Gallons. Historical trending tracks 30-day, 90-day, and 12-month averages. Anomaly alerts trigger when MPG drops 10-15% below normal.
Declining fuel efficiency indicates maintenance problems. Sudden MPG drops of 10-15% signal dirty air filters, low tire pressure, failing oxygen sensors, clogged fuel injectors, or transmission issues. Oxmaint correlates MPG trends with maintenance history—if MPG doesn't improve after service, additional problems exist. Proactive monitoring catches issues before breakdowns, reducing emergency repairs.
Yes. With GPS integration, Oxmaint cross-references purchase locations with vehicle positions. Fraud alerts trigger when purchases occur 50+ miles from vehicle location. Additional detection includes: excessive fill-up frequency, unusually large purchases, after-hours transactions, and suspicious patterns. Driver-specific cards show who made each purchase. Atob's spending controls and merchant restrictions prevent unauthorized purchases.
Reports include: Fuel Expense Summary (total spend, gallons, price trends), MPG Analysis (efficiency by vehicle/driver), Cost Per Mile Analysis, Driver Fuel Efficiency Reports, Exception Reports (anomalies and unauthorized purchases), Budget Variance Reports, and Transaction Detail Exports. All reports export to Excel, PDF, or CSV.
Both work. If you use Atob, integration adds powerful analytics. If you use different cards, Oxmaint can help evaluate switching. Atob offers universal acceptance at 95% of U.S. stations, no transaction fees, mobile app, instant activation, and advanced controls. Migration takes 7-10 days. Oxmaint also integrates with WEX, Voyager, Comdata, and FuelCloud if you prefer your current provider.
Join thousands of fleets using Atob with Oxmaint to eliminate manual logs, calculate real-time MPG, detect maintenance issues early, and prevent fuel fraud.