Complete CMMS solution for HVAC & climate control service fleets

Ensure service excellence, optimize technician productivity, and reduce costs with intelligent fleet management designed specifically for HVAC contractors, heating and cooling companies, refrigeration services, and commercial climate control providers.

HVAC Fleet CMMS Solution

Complete maintenance management for HVAC service operations

Vehicle Tracking

Service fleet monitoring

Preventive PM

Automated scheduling

Work Orders

Digital management

Analytics

Performance insights

Our Features

Built for HVAC Service Fleet Operations

Complete maintenance management tools designed specifically for service vans, HVAC tools, diagnostic equipment, and critical climate control service infrastructure

Digital Service Vehicle Inspections

Customizable checklists for service vans, HVAC trucks, refrigeration units, and diagnostic equipment.

Preventive Maintenance Scheduling

Seasonal PM scheduling for HVAC vehicles, tools, ladders, and refrigerant recovery equipment.

Vehicle Performance Tracking

Monitor service vehicle uptime, maintenance costs, and fleet reliability for customer service.

Regulatory Compliance

Maintain compliance with EPA, DOT, OSHA, and refrigerant handling requirements with automated documentation.

Work Order Management

Create, assign, and track work orders with service call priority levels and real-time status updates.

Mobile-First Platform

Empower HVAC technicians with mobile access to work orders, service manuals, and vehicle history.

MOBILE SOLUTION

Mobile Inspection App for HVAC Technicians

Equip your HVAC technicians and service staff with a mobile inspection app designed for climate control operations:

  • Complete digital inspection checklists before service calls
  • Access service vehicle history, maintenance logs, and tool inventory records
  • Report vehicle breakdowns and equipment failures instantly from job sites
  • Capture photos, refrigerant levels, signatures, and detailed notes
  • Work offline and sync when connected

Mobile Inspection App

For HVAC Service Teams

Digital Checklists

Complete pre-call inspections

Access History

Vehicle logs & tool inventory

Instant Reporting

Report breakdowns & equipment issues

Photo Capture

Photos, readings & signatures

Analytics Dashboard

Real-Time HVAC Fleet & Service Insights

Make data-driven decisions with comprehensive HVAC service analytics:

  • Live dashboards showing vehicle status, maintenance schedules, and service call metrics
  • Vehicle uptime tracking and failure analysis for HVAC service operations
  • Custom analytics on service vehicle performance and technician productivity
  • Automated alerts for maintenance due dates and seasonal preparation deadlines
  • Historical reporting with trend analysis and predictive maintenance insights
See Dashboard Demo

Real-Time Analytics Dashboard

HVAC Fleet & Service Insights

Live Fleet Dashboard

Status, schedules & service metrics

Uptime Tracking

Service vehicle reliability metrics

Performance Analytics

HVAC service fleet KPIs

Automated Alerts

Maintenance & seasonal notifications

Safety & Compliance

HVAC Service Safety Standards & Audit-Ready Documentation

Pre-configured inspection templates ensure compliance with HVAC regulatory requirements:

  • Inspection forms for service vans, HVAC tools, ladders, and refrigerant handling equipment
  • Service contract-based maintenance prioritization for customer commitments
  • Complete audit trails with timestamps, photos, and digital signatures
  • Automated compliance reporting for EPA, DOT, OSHA, and refrigerant regulations
  • Customizable templates for residential HVAC, commercial contractors, and refrigeration services
View Safety Checklists

Safety & Compliance Checklists

Audit-Ready Documentation

HVAC Vehicle Forms

Vans, trucks, tools, equipment

Service Contract Prioritization

Customer commitment-focused work orders

Regulatory Standards

EPA, DOT, OSHA, refrigerant rules

Complete Audit Trails

Timestamps, photos, digital signatures

Compliance Reporting

Automated regulatory reports

Why Choose Oxmaint

Benefits for HVAC Contractors and Service Teams

Maximize Vehicle Uptime

Proactive maintenance strategies reduce service vehicle downtime by up to 40% and improve fleet reliability.

Ensure Service Excellence

Stay compliant with HVAC safety standards through automated documentation and inspection records.

Reduce Maintenance Costs

Optimize maintenance spending by identifying failure patterns and eliminating unnecessary repairs, saving up to 30%.

Real Results from HVAC Contractors Using Oxmaint

48% Reduction in Service Vehicle Downtime

A commercial HVAC contractor operating 65 service vehicles reduced unplanned downtime by 48% and improved first-call completion rates by 42% after implementing Oxmaint's comprehensive HVAC fleet management system, resulting in $625,000 annual savings and enhanced customer satisfaction scores.

42% Higher

First-call completion improvement

$625K Saved

Annual reduction in fleet costs

95% Uptime

Service fleet availability achieved

Trusted by HVAC Professionals

"Oxmaint revolutionized our HVAC service operations. The mobile pre-call vehicle inspections reduced our roadside breakdowns by 55%, and our technicians can now report tool issues instantly. We improved our service contract compliance from 78% to 98%."

Director of Service Operations

Commercial HVAC Contractor - 65 vehicles, 85 technicians

"The seasonal maintenance reminders and refrigerant tracking saved us during EPA audits. We eliminated paper service logs completely and can now access every vehicle's complete history from any job site. Our customers love the improved response times."

Owner & Master Technician

Residential HVAC Company - 22 vans, 18 service contracts

Latest Posts

hvac-filter-osha-compliance
Read More

OSHA Compliance for HVAC Filter Maintenance & Inspections

Your facility manager receives an OSHA inspection notice. The inspector asks for HVAC maintenance records. You scramble through emails, paper logs and scattered spreadsheets. Three hours later, you still can't...

hvac-filter-predictive-maintenance
Read More

Predictive Maintenance for Hvac Filter: AI Detection of Maintenance Issue

Your facility manager walks past twelve identical rooftop HVAC units. One has a clogged filter silently driving energy costs up 28%. Which one? Without AI monitoring, you won't know until the system...

hvac-filter-inspection-checklist
Read More

HVAC Filter Inspection Checklist

That gray, dusty rectangle tucked inside your air handling unit might be the most overlooked component in your entire facility. Yet a clogged HVAC filter can increase energy consumption by up to 15%, according...

cabin-hvac-inspection-checklist
Read More

Cabin HVAC Inspection Checklist for Fleet Driver Comfort Systems

Your driver radios in from a delivery route in August—the AC just quit. Cab temperature climbs past 100°F within minutes. That driver now faces a choice: push through in dangerous heat or pull over and miss...

assets-qr-hvac-workflow
Read More

Assets QR Workflow for HVAC Teams

Your HVAC technician arrives at Building C to service a rooftop unit. The work order says "RTU-7" but there are twelve identical units on that roof—none labeled. He spends 18 minutes calling the office,...

classroom-hvac-inspection-checklist
Read More

Classroom HVAC Inspection Checklist for Schools & Universities

The thermostat reads 74°F but students in the back row are wearing jackets. The teacher near the window has a portable fan running year-round. Three complaints hit your desk this week about "stuffy air" in...

public-building-hvac-inspection-rca
Read More

Root Cause Analysis (RCA) for Public Building HVAC Inspection Failures

The HVAC inspection failed again. Third time this quarter. The inspector flagged inadequate airflow in the east wing, temperature control issues in the community center, and filter maintenance gaps across...

Total Posts:

HVAC INTEGRATIONS

Connected Ecosystem

Seamlessly integrate with service dispatch systems, HVAC business software, and GPS tracking for complete visibility.

Explore all integrations

Transform Your HVAC Service Fleet Operations

Join leading HVAC contractors, climate control companies, and refrigeration services who trust Oxmaint to optimize their maintenance operations and ensure service excellence.