Battery & Charging
- Log voltage before and after shift
- Check terminal condition and connector security
- Confirm water level and equalization cycle
- Inspect for heat damage or battery leakage
Drive & Steering System
- Test smoothness of acceleration and steering return
- Inspect tires for wear, flat spots, and air pressure
- Check drive motor sounds and regen braking behavior
Hydraulics & Mast
- Cycle lift, tilt, and side-shift under no-load
- Inspect hoses for leaks or fraying
- Lubricate rollers and inspect fork heels
Control Systems
- Test dash display, alert lamps, and diagnostic readout
- Check switch and lever functionality across ranges
- Verify inching pedal smoothness and return
SAS & Safety Logic
- Observe SAS lamp behavior at start and stop
- Simulate tilt restrict and verify override status
- Confirm seatbelt interlock and seat switch logic
Operator Safety & Visuals
- Check mirror clarity, fire extinguisher tag, and decals
- Verify overhead guard integrity and lighting
- Inspect backup alarm and horn sound output
Feedback & Reporting
- Log concerns such as unusual noise or response delay
- Submit checklist to digital platform for recordkeeping
- Notify maintenance of any warnings or red lights