Battery & Electrical
- Inspect charge connector and cable condition
- Check battery restraint and cell water levels
- Log total charge cycles and monthly kWh usage
Drive System
- Inspect directional control and throttle smoothness
- Check parking brake and service brake function
- Inspect tires and steering linkage
Hydraulic System
- Check for leaks in mast hoses and tilt cylinders
- Lubricate carriage and mast channels
- Cycle hydraulic functions under full load
Structure & Frame
- Inspect forks, welds, backrest, and overhead guard
- Verify load plate and decals are readable
- Check operator station for cleanliness and damage
Safety Equipment
- Test horn, lights, alarms, seatbelt, and mirror
- Verify fire extinguisher tag and mount condition
- Check display alerts and SAS status indicator