Toyota 8FB40 Electric Forklift – Expanded Daily Checklist
Perform a comprehensive inspection of your 8FB40 electric forklift each day to ensure safe, compliant, and reliable operation.
Battery & Charging
- Check charge level and battery indicator function
- Log water top-off date and inspect caps and vent ports
- Test connector integrity and cable insulation
Controls & Interface
- Verify lift, tilt, and side-shift function without delay
- Inspect all warning lights, gauges, and display
- Check horn, headlight, reverse buzzer, and strobe
Hydraulics
- Cycle mast to full height and tilt to both ends
- Inspect hoses, fittings, cylinders, and mast bearings
- Lubricate all zerks as marked
Drive & Steering
- Test steering play and responsiveness
- Check smooth engagement of forward/reverse selector
- Inspect drive axle area for leaks or abnormal wear
Safety Features
- Check seatbelt function and anchorage
- Verify seat switch and operator presence circuit
- Inspect overhead guard, decals, and extinguisher tag
Tires & Wheels
- Inspect tread wear, sidewall cracks, or cuts
- Check inflation (if pneumatic) or wear band (solid)
- Verify all lug nuts are secure
SAS & Electronics
- Confirm SAS warning light tests and resets
- Check tilt restrict function and stability override
- Scan for any fault codes or logged events
Operator Comments
- Report abnormal noise, vibration, or handling
- Record feedback for follow-up or investigation