Toyota 8FD25 Diesel Forklift – Daily Maintenance Checklist

This checklist guides daily inspection and maintenance tasks for the Toyota 8FD25 diesel forklift to ensure operational safety and equipment reliability.

Tyres and Wheels

  • Check tyre pressure (solid/pneumatic) for appropriateness and evenness.
  • Inspect tyre surface for cracks, splits, or embedded debris.
  • Verify adequate tread depth (visual check or gauge).
  • Ensure lug nuts are tight and not missing.
  • Inspect rims for damage, warping, or weld cracks.
  • Check for proper wheel bearing operation (no play or noise).

Fluid Checks

  • Verify engine oil level and condition.
  • Check hydraulic fluid level and clarity.
  • Inspect transmission fluid (if separate).
  • Ensure brake fluid level and appearance are satisfactory.
  • Check radiator coolant level and inspect for leaks.
  • Confirm fuel level (diesel tank) and ensure the cap is tight.
  • Look for any visible fluid leaks under the forklift.

Forks & Mast Assembly

  • Check forks for straightness, ensuring they are not bent and are securely mounted.
  • Verify fork heel wear is below 10% of original thickness.
  • Ensure locking pins and retaining clips are in place.
  • Lubricate mast chains and ensure even tension.
  • Inspect lift cylinder pins and bushings for security.
  • Ensure backrest and carriage assembly are secure and crack-free.

Safety & Controls

  • Ensure seat belt is operational and not frayed.
  • Test horn, backup alarm, and lights for proper operation.
  • Check steering function for smoothness and responsiveness.
  • Verify that service and parking brakes engage fully.
  • Ensure the emergency stop/kill switch works (if equipped).
  • Verify fire extinguisher is present and fully charged.
  • Ensure overhead guard and operator compartment are secure.
  • Confirm load capacity plate is readable and accurate.

Operational Functionality Test

  • Verify that the engine starts without abnormal sound or smoke.
  • Test lift, tilt, and side-shift functions for smooth operation.
  • Ensure travel in forward and reverse functions properly.
  • Inspect hydraulic hoses for leaks or chafing.
  • Check gauges and warning lights for proper function.
  • Verify smooth operation of all hydraulic controls.

Additional Safety Items

  • Check mirrors for proper adjustment and cleanliness.
  • Inspect operator's manual presence and accessibility.
  • Verify warning decals and safety labels are intact.
  • Ensure operator certification is current and displayed.
  • Check for any modifications or unauthorized attachments.
  • Verify proper ventilation in operating area for diesel exhaust.