Battery & Charging System
- Perform battery load and capacity test.
- Inspect battery cables and terminals for corrosion.
- Check battery electrolyte levels and refill as needed.
- Verify battery charger functionality and connections.
Hydraulic System
- Inspect and replace hydraulic fluid filters if necessary.
- Check hydraulic hoses and fittings for leaks or wear.
- Test hydraulic pressure and system responsiveness.
- Examine cylinders and seals for proper operation and leaks.
Tyres & Wheels
- Inspect tyres for adequate tread and condition.
- Check tyre pressure and adjust accordingly.
- Ensure wheel lug nuts are properly tightened.
- Inspect wheels and rims for damage or cracks.
Forks & Mast
- Check forks for structural integrity and proper alignment.
- Inspect mast chains and adjust tension as necessary.
- Lubricate mast rollers and pivot points.
- Ensure smooth and stable mast operation.
Brakes & Steering
- Inspect brake pads and drums for wear.
- Test brake fluid levels and quality.
- Check steering system for smooth operation.
- Inspect steering linkage and pivot points.
Electrical & Lighting Systems
- Check all electrical wiring and connections for damage.
- Test lighting systems including headlights and indicators.
- Inspect control panels and switches for proper function.
- Ensure emergency stop and safety controls are operational.
Safety & Operator Compartment
- Inspect seatbelts and restraint systems for function.
- Check overhead guard condition and mounting.
- Ensure all mirrors and visibility aids are properly adjusted.
- Verify operator compartment is clean and unobstructed.