Battery & Charging System
- Inspect and clean battery terminals and cables.
- Check battery electrolyte levels weekly.
- Test charger functionality and connections.
- Examine battery restraints for security.
Hydraulic System
- Check hydraulic fluid level and top off as needed.
- Inspect hoses and connections for leaks or damage.
- Ensure smooth operation of hydraulic controls.
- Lubricate all moving hydraulic components.
Tyres & Wheels
- Inspect tyre pressures and adjust accordingly.
- Check tyre tread depth and condition.
- Inspect wheels for damage or cracks.
- Ensure lug nuts are tight and secure.
Forks & Mast
- Inspect forks for bends, cracks, or wear.
- Check mast chain tension and lubrication.
- Test fork adjustment mechanisms.
- Verify smooth mast operation through its full range.
Brake & Steering Systems
- Check brake operation and response.
- Inspect brake components for wear.
- Test steering system for smoothness and response.
- Examine steering linkage and pivot points.
Electrical & Lighting Systems
- Inspect wiring and connections for wear or damage.
- Test operation of lights, indicators, and alarms.
- Check control panel gauges for accurate readings.
- Verify emergency stop functionality.
Operator Safety & Controls
- Check seatbelt and operator restraints for function.
- Ensure mirrors are clean and properly adjusted.
- Inspect operator compartment for cleanliness.
- Check visibility aids for clear, unobstructed view.