Battery System
- Perform comprehensive battery capacity test.
- Inspect and replace damaged battery cables.
- Conduct thorough inspection of battery compartment.
- Evaluate and replace battery cells as necessary.
Hydraulic & Fluid Systems
- Replace hydraulic fluid and clean system.
- Inspect and replace hydraulic seals and hoses.
- Perform pressure testing on hydraulic system.
- Check and replace hydraulic filters.
Forks & Mast
- Conduct detailed inspection for structural integrity.
- Perform non-destructive testing (NDT) on forks and mast.
- Replace mast rollers and bearings if needed.
- Verify proper mast alignment and functionality.
Brake & Steering Systems
- Replace worn brake pads, discs, and drums.
- Perform detailed inspection of steering linkage.
- Inspect and service steering hydraulic system.
- Check parking brake operation thoroughly.
Electrical & Lighting Systems
- Inspect and test electrical wiring and harnesses.
- Replace bulbs and fixtures as necessary.
- Perform detailed inspection of electronic controls.
- Ensure proper operation of safety interlocks.
Tyres & Wheels
- Replace tyres showing significant wear.
- Inspect wheels and replace damaged rims.
- Service wheel bearings and hubs.
- Verify alignment and balance wheels.
Safety & Operator Comfort
- Replace seat belts and restraint systems as needed.
- Inspect and replace worn seat components.
- Evaluate and enhance operator visibility systems.
- Inspect and replace safety decals and warning labels.