Noblelift JS35 Electric Forklift – Monthly Maintenance Checklist

Comprehensive monthly maintenance procedures for ensuring forklift safety and reliability.

Tyres and Wheels

  • Inspect tyre pressure and condition.
  • Check tread depth and rim integrity.
  • Inspect wheel bearings and grease if necessary.

Battery and Electrical System

  • Check battery terminals for corrosion and proper charge levels.
  • Inspect battery cables and electrical connections.
  • Test battery charger for proper operation.

Hydraulic System

  • Inspect hydraulic fluid levels and top up if required.
  • Check hydraulic hoses and connections for leaks or damage.
  • Replace hydraulic filters according to schedule.

Forks, Mast, and Lift Mechanism

  • Inspect forks for any wear or deformation.
  • Lubricate mast chains and verify even tension.
  • Inspect lift cylinders and bushings.

Safety and Controls

  • Test brakes, emergency stops, and safety switches.
  • Inspect lights, alarms, and operator restraints.
  • Ensure load capacity labels are clear and accurate.

Operational Checks

  • Verify smooth operation of steering and hydraulic controls.
  • Listen for abnormal sounds or vibrations during operation.
  • Test acceleration, braking, and directional control.