Hangcha CPCD30 Monthly Forklift Inspection Procedure

Ensure OSHA compliance and extend forklift life with this structured monthly maintenance process.

1. Pre-Inspection Safety Measures

2. Tyre and Wheel Check

3. Fluid Inspection

4. Forks and Mast Evaluation

5. Hydraulic and Engine Testing

6. Safety System Validation

7. Battery and Electrical Check

8. Documentation and Closeout

Use Checklist Online