1. Inspection Setup & Review
- Schedule weekly inspection before high-load operations
- Review prior weekly log and maintenance actions
- Ensure access to all tools, forms, and lubricants
- Visually inspect the forklift and surrounding area
- Document starting hour meter reading
2. Wheel & Tire Integrity
- Measure tire pressure and tread depth
- Inspect sidewalls for cuts or bulges
- Grease wheel bearings and inspect rims
- Check alignment and lug nut torque
- Ensure debris is cleared from tire grooves
3. Hydraulic & Fluid Systems
- Test brake, hydraulic, and transmission fluids
- Replace fluids if contamination is detected
- Inspect hoses for cracks or leaks
- Top off coolant and fuel tanks
- Log all fluid changes and top-offs
4. Mast & Fork Assembly
- Check forks for bending or excessive wear
- Lubricate mast chains and adjust tension
- Inspect mast rollers and side-shift for smooth motion
- Ensure secure mounting of backrest and carriage
- Verify fork locking mechanisms
5. Safety Devices & Controls
- Test emergency stop, horn, and alarm systems
- Check seat belt function and overhead guard condition
- Inspect load capacity plate visibility
- Ensure all decals and signs are intact
- Check fire extinguisher pressure
6. Electrical & Battery Systems
- Test battery charge and alternator output
- Inspect wiring for frays or exposed connections
- Clean battery terminals and secure mount
- Test lights, gauges, and dashboard indicators
- Check fuse box and replace any blown fuses
7. Final Review & Documentation
- Document findings and maintenance actions
- Submit weekly report through Oxmaint APP
- Flag urgent issues for technician follow-up
- Upload photographic evidence if needed
- Ensure all inspection data is saved for audit