Forklift Guangxi LiuGong CLG 835H Yearly Inspection Procedure

Execute this annual inspection protocol to maintain long-term forklift performance, meet OSHA standards, and reduce equipment failure risk.

1. Pre-Inspection Setup

2. Engine & Transmission Evaluation

3. Hydraulics & Mast Inspection

4. Brake, Steering, & Tire Check

5. Electrical & Battery System

6. Structural & Safety Equipment

7. Documentation & Reporting

Use Checklist Online