Follow this OSHA-compliant daily inspection procedure to ensure safe and efficient operation of the LiuGong CLG 835B diesel forklift.
Daily, prior to the start of each shift per OSHA regulations for powered industrial trucks.
Diesel fuel, engine oil, brake fluid, coolant, and hydraulic fluid.
Yes, Oxmaint digital checklists meet OSHA recordkeeping and traceability standards.
Seat belt, brake system, forks, and backup alarm. These ensure safe daily operation.
Yes. Oxmaint allows centralized fleet management across different models and locations.