Pre-Start Safety Check
- Verify operator certification and review prior shift reports
- Inspect the work area for any operational hazards
- Ensure required PPE is worn and ready
Battery & Electrical System Inspection
- Check battery charge and voltage levels
- Inspect battery terminals for corrosion and secure connections
- Ensure electrolyte levels are within specification (if applicable)
- Verify charger cables and connections are functional
Tires & Wheels Check
- Inspect tire pressure and look for signs of damage or wear
- Verify that wheel nuts and bolts are properly secured
- Check for proper wheel alignment and smooth rotation
Hydraulic System Inspection
- Check hydraulic fluid levels and look for leaks
- Test lift, tilt, and steering functions for smooth operation
- Inspect hydraulic hoses and connections for wear or damage
Safety & Control Systems Test
- Test service brakes, parking brake, and horn
- Verify functionality of lights, alarms, and displays
- Inspect seatbelts, overhead guard, and operator restraints
- Check emergency stop switch and warning indicators