Battery System Analysis
- Perform comprehensive battery capacity testing and document results
- Check specific gravity of battery cells and equalize if needed
- Inspect terminals, cables, and charger connections for wear or corrosion
- Verify battery compartment ventilation and cooling systems
Hydraulic System Deep Inspection
- Analyze hydraulic fluid for contamination and viscosity levels
- Test hydraulic pressures at key points in the system
- Inspect hoses, seals, and connections for wear or leaks
- Check hydraulic cylinders for proper operation and seal integrity
Fork, Mast & Lift Components Evaluation
- Measure fork heel wear and check for cracks or deformation
- Lubricate mast chains and check tension levels
- Test mast lifting and tilting functions under load
- Inspect welds and frame for signs of stress or damage
Safety Systems & Performance Testing
- Test service and parking brakes under operational conditions
- Verify operation of emergency stop systems and alarms
- Inspect operator restraints, lights, and backup alarms
- Document performance trends, issues, and recommend repairs