Pre-Operation Walkaround
- Inspect forklift exterior for damage or leaks
- Check tyres for pressure, wear, and damage
- Verify overhead guard and load backrest integrity
- Ensure all safety decals are intact and visible
Battery & Electrical System
- Check battery charge level and connections
- Inspect battery compartment for leaks or corrosion
- Test horn, lights, and backup alarms
- Ensure all electrical components function properly
Hydraulic System Check
- Verify hydraulic fluid levels
- Inspect hoses, cylinders, and connectors for leaks
- Test lift, tilt, and side-shift operations
- Check for unusual noises during operation
Operational Controls Test
- Verify steering and brake functionality
- Test drive function in both directions
- Check control levers for proper movement
- Confirm emergency stop button operation