Combilift Electric C5000 - Weekly Inspection Procedure
Step-by-step weekly inspection process for maintaining forklift safety, compliance, and performance.
Initial Checks
- Review previous inspection reports and maintenance records
- Inspect tyres, wheels, and brakes for wear and damage
- Ensure proper tyre pressure and brake functionality
Battery & Electrical System Review
- Perform battery load testing and record voltage under load
- Inspect terminals and connections for corrosion and tightness
- Verify charger functionality and record charging data
Hydraulic System Inspection
- Check fluid levels and top up as needed
- Inspect hoses, seals, and cylinders for leaks or damage
- Test hydraulic functions under moderate load
Operational Test & Safety System Checks
- Verify lift, tilt, and steering operations for smoothness
- Test horn, alarms, lights, and emergency stop system
- Check seatbelt and safety devices for proper function
Lubrication & General Maintenance
- Lubricate mast chains, bearings, and pivot points as needed
- Inspect and clean air filters, belts, and cooling systems
- Document any findings or repairs needed in the maintenance log
Final Documentation & Reporting
- Complete the weekly inspection report and submit for review
- Plan follow-up maintenance based on inspection findings
- Verify regulatory compliance and log inspection in system