Trane Thermafit™ – Weekly Screw Vapor Chiller Maintenance Procedure
Use this checklist to perform weekly maintenance on Trane Thermafit™ screw vapor chillers for energy-efficient, reliable, and safe HVAC operations.
General System Overview
- Thorough visual inspection for wear, corrosion, or physical damage.
- Record and analyze operating hours and compressor starts.
- Review alarm history for recurring issues or patterns.
- Check insulation integrity on pipes and vessels.
- Verify all safety guards and panels are secure.
- Document any unusual sounds or vibrations.
Control System Review
- Download weekly trend data from Tracer™ system.
- Verify control setpoints match current load requirements.
- Check sensor readings for accuracy and drift.
- Test manual override functions.
- Verify BAS communication status.
- Document control response times and accuracy.
Screw Compressor Inspection
- Monitor compressor for smooth operation and unusual sounds.
- Check vibration levels and compare to baseline.
- Verify slide valve operation through load range.
- Monitor discharge temperature trends.
- Check compressor current draw patterns.
- Document capacity control response.
Oil System Check
- Inspect oil level and color for contamination.
- Check oil pressure differential.
- Verify oil temperature within specifications.
- Test oil heater operation and setpoint.
- Check oil filter differential pressure.
- Document oil consumption if any.
Refrigerant System Check
- Measure and record operating pressures.
- Calculate superheat and subcooling values.
- Check sight glass for refrigerant flow.
- Inspect for signs of refrigerant leaks.
- Verify economizer operation (if equipped).
- Document refrigerant performance trends.
Electrical Components
- Inspect electrical connections for tightness and corrosion.
- Check motor amperage against specifications.
- Verify control panel displays and functionality.
- Test control circuit voltages.
- Check starter/VFD operation and cooling.
- Inspect for signs of overheating.
Water Systems
- Verify chilled water flow and pressure.
- Check condenser water flow and temperature.
- Clean Y-strainers and document debris.
- Inspect pump operation and seals.
- Test water treatment levels.
- Verify flow switch operation.
Heat Exchanger Performance
- Check approach temperatures and log trends.
- Inspect for signs of fouling or scaling.
- Verify temperature differential across coils.
- Check for proper refrigerant distribution.
- Document heat transfer efficiency.
Safety Systems Test
- Test high/low pressure safety switches.
- Verify temperature sensors and alarms.
- Test emergency shutdown functionality.
- Check oil pressure safety switches.
- Verify flow switch interlocks.
- Test relief valve operation indicators.
Performance Monitoring
- Calculate and record weekly average kW/ton.
- Review energy usage patterns and trends.
- Analyze capacity vs.
- Compare performance to design specifications.
- Document runtime and cycling patterns.
- Identify efficiency improvement opportunities.
Documentation & Reporting
- Complete weekly inspection log with all findings.
- Update maintenance tracking system.
- Document any corrective actions taken.
- Schedule follow-up maintenance as needed.
- File water treatment test results.
- Generate weekly performance summary.