Daikin WRC – Weekly Chiller Maintenance Procedure

Use this checklist to perform weekly maintenance on Daikin WRC vapor absorption chillers for optimal reliability, water chemistry, and system safety.

System Overview & Trend Analysis

  • Review daily logs from past week for abnormal patterns or recurring issues
  • Inspect chiller and equipment room for leaks, damage, or unusual conditions
  • Verify total operating hours align with expected runtime and load profile
  • Test all alarms for proper function and audibility throughout equipment room
  • Check equipment accessibility and ensure clear pathways for emergency access
  • Document any changes in operating conditions or performance since last week

Solution System Inspection

  • Measure lithium bromide concentration and compare with optimal range
  • Check solution levels in absorber and generator sumps for proper operation
  • Inspect solution pumps for smooth operation, vibration, and seal integrity
  • Verify solution flow indicators showing proper circulation rates
  • Check for crystallization indicators at typical problem areas
  • Document solution temperature differentials across heat exchangers

Water Treatment & Quality

  • Test cooling water pH, conductivity, and treatment chemical levels
  • Verify chemical feed systems operating properly with adequate supply
  • Check blowdown system operation and adjust as needed
  • Inspect strainers and clean if pressure drop exceeds limits
  • Test chilled water system for proper treatment levels
  • Document all water test results and chemical additions

Heat Transfer Performance

  • Record approach temperatures for condenser and absorber
  • Check heat exchanger performance against baseline values
  • Inspect spray nozzles for proper pattern and distribution
  • Verify eliminator pads are clean and functioning properly
  • Monitor steam/hot water consumption for efficiency trends
  • Schedule tube cleaning if approach temperatures exceed limits

Vacuum & Purge System

  • Record system vacuum levels and compare with specifications
  • Monitor purge unit runtime and frequency over past week
  • Check purge storage tank level and drain if necessary
  • Inspect visible gaskets and seals for potential leak points
  • Verify vacuum pump oil level and condition
  • Document purge trends to identify increasing air infiltration

Control System & Sensors

  • Verify control display readings match field instrument values
  • Check control valve operation and response to load changes
  • Test temperature and pressure sensor accuracy with portable instruments
  • Review control system event log for abnormal occurrences
  • Verify setpoints appropriate for current operating conditions
  • Clean control panel filters and check cooling fan operation

Electrical & Mechanical Systems

  • Check motor amperage draw and compare with nameplate ratings
  • Inspect electrical connections for signs of overheating or corrosion
  • Verify proper motor ventilation and clean air intake screens
  • Check pump alignment and coupling condition visually
  • Listen for unusual vibrations or noises from rotating equipment
  • Inspect motor bearings for proper lubrication schedule compliance

Safety Systems Testing

  • Test high/low pressure safety switches for proper operation
  • Verify temperature limit controls functioning correctly
  • Test flow switches in chilled and cooling water circuits
  • Check crystallization protection system ready for operation
  • Verify emergency stop buttons accessible and functional
  • Test refrigerant and water leak detection systems

Performance & Documentation

  • Calculate weekly average COP and compare with design
  • Review energy consumption patterns for optimization opportunities
  • Update maintenance log with all inspection findings
  • Document any maintenance performed and parts replaced
  • Create work orders for issues requiring follow-up action
  • Review upcoming maintenance schedule and order necessary parts