Anhui Forklift Diesel 2.0T Daily Inspection Procedure
Follow this daily pre-operation inspection to maintain safety, compliance, and operational performance.
Pre-Shift Safety Checks
- Conduct a full visual inspection for damage or fluid leaks
- Ensure load capacity plates and safety decals are visible
- Inspect operator’s compartment for cleanliness and hazards
- Verify fire extinguisher is present and charged
Tire & Wheel Inspection
- Check tire pressure and inspect for cuts, cracks, or debris
- Verify lug nuts are tight and rims are damage-free
- Ensure tires have adequate tread depth and no uneven wear
Fluid System Verification
- Check engine oil, hydraulic fluid, brake fluid, and coolant levels
- Inspect fuel level and confirm secure fuel cap
- Check for visible fluid leaks under the forklift
Mast & Fork Assembly Check
- Inspect forks for cracks, straightness, and secure locking
- Check mast chains for tension and lubrication
- Verify mast operation is smooth and free of obstruction
Safety Systems Test
- Verify seat belt functionality and operator restraint system
- Test horn, lights, backup alarm, and emergency stop switches
- Ensure overhead guard and all safety shields are intact
Operational Functionality Test
- Start engine and check for abnormal noise or smoke
- Test lift, tilt, and travel operations for smoothness
- Verify hydraulic systems operate without leaks or hesitation
- Ensure brakes and steering respond properly