Tire & Wheel Inspection Procedure
- Check tire pressure and document readings
- Inspect tread depth, wear patterns, and any damage
- Check wheel bearing condition and lubrication
- Examine rims for cracks, warping, or structural issues
Fluid System Check Procedure
- Check all fluid levels (engine oil, hydraulic, brake, coolant, fuel)
- Inspect fluids for contamination, discoloration, or degradation
- Drain water from fuel separator and inspect fuel quality
- Record fluid replacement needs and plan for service
Mast & Fork Assembly Check Procedure
- Measure fork heel thickness and inspect for cracks or damage
- Lubricate mast chains, rollers, and moving parts
- Verify proper operation of lift and tilt functions
- Check mast pins, bushings, and carriage alignment
Brake & Safety Systems Test Procedure
- Test service and parking brakes for wear and stopping power
- Verify function of horns, alarms, lights, and seat belts
- Check emergency stops and safety shutdown systems
- Inspect fire extinguisher and safety decals
Engine & Exhaust System Check Procedure
- Inspect engine belts, pulleys, and mounts for wear
- Check exhaust system for leaks or unusual noise
- Clean or replace air filters and test airflow
- Verify cooling system operation and radiator condition
Electrical & General Inspection Procedure
- Clean battery terminals and check charge level
- Inspect electrical wiring for damage or loose connections
- Test alternator and charging system
- Conduct general inspection of frame, body, and attachments